From This Old House, “How To Install Hardwood Floors” (updated April 8, 2026). Your flooring maker’s instructions come first.
This hardwood flooring installation how-to starts with the question that decides everything else: what is under the floor? Solid hardwood gets nailed to a wood subfloor. Many Houston-area homes sit on a concrete slab instead, and This Old House does not recommend solid hardwood there; engineered wood, glued down or floating, is the option it describes for concrete.
Below are both paths, step by step, with the numbers that matter. If you would rather hand it off, our flooring installation page explains how we measure, check the subfloor and price a job, and the estimate is free.
What’s in this guide
- Solid or engineered: which one your floor allows
- Before you start
- Nail-down solid hardwood, step by step
- Engineered wood on a concrete slab
- Houston humidity and wood floors
- When water got there first
- Hardwood installation questions
Solid or Engineered: Which One Your Floor Allows
Solid hardwood is one piece of wood through its whole thickness. Engineered hardwood has a real wood top layer bonded over a plywood-style core, which makes it more stable when humidity changes. The subfloor narrows the choice before style ever comes into it.
| Method | Works over | Floor type | Expansion gap |
|---|---|---|---|
| Nail-down | Wood subfloor only (¾-inch plywood or OSB) | Solid or engineered | ¾ inch for solid |
| Glue-down | Concrete, radiant heat | Engineered | Per the maker |
| Floating | Concrete and most other subfloors | Engineered | About 5/16 inch |
From This Old House, How To Install Hardwood Floors (April 8, 2026) and How to Lay Engineered Wood Floors (April 14, 2026).
This Old House describes solid hardwood as suited to stable humidity and above-grade floors, 18 inches or more above the ground. A pier-and-beam house or a second floor framed in wood can take it. A slab-on-grade house is where engineered wood earns its place.
Before You Start
- Buy extra. Measure the room and add a margin for cuts and waste; your flooring supplier will say how much for the board lengths you choose.
- Acclimate. This Old House says to let solid flooring sit in the room for three to seven days with normal living conditions, and engineered planks for three days out of the boxes. Keep the room at 60 to 80°F and 30 to 50 percent relative humidity.
- Measure the moisture. With a moisture meter, check that the flooring is within 2 percent of the subfloor’s moisture content before you start. If the subfloor reads high, find out why.
- Prep the subfloor. Take up the old flooring, pull nails and tack strips, and make sure a wood subfloor is securely fastened to the joists. Old vinyl tile or sheet flooring can contain asbestos, according to the EPA; have it tested before you scrape it up.
- Gather the tools. Tape measure, chalk line, moisture meter, miter or circular saw, jamb saw, drill, spacers, pry bar, and for nail-down floors a flooring nailer. This Old House calls a pneumatic nailer optional but recommended.
Nail-Down Solid Hardwood, Step by Step
- Plan the direction. This Old House says boards generally run perpendicular to the floor joists for structural stability.
- Undercut the door casings so the boards slide underneath instead of being scribed around the trim.
- Snap a starting line along the longest straight wall, leaving a ¾-inch expansion gap at the wall.
- Face-nail the first row near the wall side, since the nailer cannot reach it yet. Pre-drill at a 45-degree angle, about half an inch from the tongue side.
- Blind-nail the field. From the second or third row on, the nailer drives fasteners through the tongue at the right angle. This Old House says to nail every 6 to 8 inches along each board and within 2 to 3 inches of the ends.
- Stagger the end joints. A minimum offset of 6 inches between rows is a good starting point; vary the board lengths so no pattern repeats.
- Face-nail the last rows where the nailer will not fit against the far wall, again keeping the ¾-inch gap.
- Trim out. Put the baseboard or shoe molding back, fastened to the wall and not the floor, so the floor can still move.
Unfinished solid wood then gets sanded and finished in place; prefinished boards are done once the trim is on.
Engineered Wood on a Concrete Slab
Nail-down is out on concrete, since there is nothing to nail into. This Old House gives two methods that work there:
- Glue-down. The planks are bonded to the slab with flooring adhesive. This Old House calls it ideal over concrete. It is firm underfoot, but the planks are hard to reposition once the adhesive sets, so dry-lay a few rows first.
- Floating. The planks lock or glue to each other and rest on an underlayment, not on the slab. It leaves a 5/16-inch expansion gap hidden under the shoe molding or quarter-round.
Either way, the slab comes first. This Old House says to run a moisture test on concrete and put down a vapor barrier if needed. A slab that is wet underneath will ruin a wood floor from below no matter how well it is laid. Use the adhesive or underlayment your plank’s maker specifies.
Floating engineered wood goes down much like laminate. Our guide to how to install laminate flooring walks through the underlayment, the first row and the last row in detail.
Houston Humidity and Wood Floors
Wood takes on moisture from the air and gives it back. This Old House recommends keeping indoor humidity between 30 and 50 percent. In a Houston house that mostly means running the air conditioning normally, before the flooring arrives, while it acclimates, and after it is down. A house left closed up without air conditioning in August, or a floor laid while a renovation has the doors open for weeks, is how boards end up cupped or gapped.
Signs the floor is fighting moisture:
- Cupping: board edges higher than the middle, usually moisture from below.
- Gaps opening between boards in dry months and closing in humid ones, which is normal in small amounts.
- Buckling or boards lifting off the subfloor, often from too little expansion gap or a lot of water.
When Water Got There First
If you are replacing a wood floor because it got wet, find the water before you buy new boards. Swelling near an outside wall or under a ceiling stain can point to a leak above, and a new floor over a damp subfloor will cup again.
We start with a free roof inspection and fix the source. If the house got soaked, it has to be dried out by a water-mitigation company first. Then we take out the damaged flooring, check the subfloor and put the room back together, and if the ceiling took water too, the drywall can be part of the same job.
Doing it yourself saves the labor, which is a large part of the price: our guide to flooring installation cost has the national numbers for hardwood and the other floor types. If you would rather have it done, we install floors across greater Houston, from Houston to Spring, The Woodlands, Conroe, Pearland, Missouri City and Fresno. Hablamos español. Get a free flooring estimate or use the form on this page.
Sources checked November 17, 2026: This Old House, How To Install Hardwood Floors (updated April 8, 2026); This Old House, How to Lay Engineered Wood Floors (updated April 14, 2026); EPA, Learn About Asbestos (updated July 13, 2026). Always follow your flooring maker’s installation instructions.
Hardwood Installation Questions
How do you install hardwood flooring?
Acclimate the wood in the room for three to seven days, check that it is within 2 percent of the subfloor's moisture content, then nail it to a wood subfloor: face-nail the first row, blind-nail the rest through the tongue every 6 to 8 inches, stagger end joints at least 6 inches, and leave a 3/4-inch gap at the walls. On concrete, use engineered wood glued down or floating instead.
Can you put hardwood flooring on a concrete slab?
Not solid hardwood nailed down, since there is nothing to nail into. This Old House describes engineered wood, glued to the slab or floated over an underlayment, as the option for concrete, after a moisture test and a vapor barrier if the slab needs one.
How long should hardwood acclimate before installation?
This Old House says three to seven days for solid hardwood and three days for engineered planks, in the room where they will go, at 60 to 80 degrees and 30 to 50 percent relative humidity. A moisture meter tells you when the wood is within 2 percent of the subfloor.
How big an expansion gap does hardwood need?
This Old House calls for 3/4 inch around the room for nail-down solid hardwood and 5/16 inch for a floating engineered floor. The baseboard or shoe molding covers it, fastened to the wall and not the floor.
Which way should hardwood boards run?
Generally perpendicular to the floor joists, which This Old House says is for structural stability. On a slab there are no joists, so the direction is mostly a matter of looks.
Why is my hardwood floor cupping?
Cupping, with the board edges higher than the middle, usually means moisture is coming from below: a damp slab or crawlspace, or water from a leak. Find and fix the source before replacing boards. If the water came from above, Roofshire's roof inspection is free.