Acclimate
48 hours+
in the room, out of the plastic
Expansion gap
¼ inch
all the way around
Stagger end joints
6 inches+
row to row

From This Old House, “How to Lay a Floating Floor” (updated June 2, 2026) and Bob Vila, “How to Install Laminate Flooring” (updated February 24, 2022). Your product’s instructions come first.

How to install laminate flooring comes down to five jobs: let the planks get used to the room, get the subfloor flat and dry, lay underlayment, click the rows together with a gap at every wall, and finish the edges with trim. Laminate is a floating floor, so there are no nails and no glue. The planks lock to each other and sit on top of the underlayment.

This guide walks through each step, with the numbers that matter, and covers the part that catches people out in Houston: concrete slabs and moisture. If you would rather have it done, our flooring installation page explains how we measure, check the subfloor and price a job.

What’s in this guide

Before You Start

Buy enough. Multiply the room’s width by its length and add 10 percent for cuts and waste, Bob Vila advises. Boxes typically hold 22 to 24 square feet.

Let it acclimate. This Old House says to leave the flooring in the room at least 48 hours before you start, and its pro tip is to keep the room at 60 to 80°F and 30 to 50 percent relative humidity while it sits. Take it out of the plastic so air can reach it. In a Houston house, that means running the air conditioning as normal, not laying the floor in a closed-up house in August.

Pick the right grade. Laminate’s wear layer is rated on an Abrasion Criteria (AC) scale from AC1 for low-traffic rooms like bedrooms to AC5 for commercial traffic; This Old House says most home laminate is AC3 or AC4. A hallway or kitchen wants the higher end.

Gather the tools. Tape measure, pencil, spacers, tapping block, pull bar, a dead blow hammer, a saw (jigsaw, circular saw or a laminate cutter), a jamb saw or handsaw for door casings, a utility knife, safety glasses and gloves.

StepWhat to get rightThe number
AcclimatePlanks in the room, out of the plasticAt least 48 hours
SubfloorFlat, clean, dry; nails and tack strips pulledSlab passes the plastic test
UnderlaymentFlat, no crimps; barrier over concrete6-mil plastic sheet on damp concrete
Expansion gapSpacers at every wallAbout ¼ inch
End jointsStaggered row to rowAt least 6 inches apart
WasteExtra for cutsAdd 10 percent

Figures: This Old House floating-floor and laminate guides (June 2026); Bob Vila (February 2022).

Step 1: Prepare the Subfloor

Take off the baseboards first. Then pull up the old flooring if it is damaged, along with nails, staples and carpet tack strips. A floating floor follows whatever is under it, so low spots and humps show through as planks that flex, click or separate. Bob Vila suggests leveling uneven spots with thin ¼-inch lauan and patching any missing chunks.

Two things to check while the floor is bare:

  • Old vinyl tile or sheet flooring. The EPA lists vinyl floor tiles, the backing on vinyl sheet flooring, and adhesives among the places asbestos may be found. If the house is older and you find old vinyl, leave it alone and have it tested before you scrape it up.
  • Soft spots or stains. A soft, dark or crumbling area in a wood subfloor means it got wet. Find out why before you cover it, because new laminate over a damp subfloor will not last.

Step 2: Underlayment and Moisture Barrier

If the planks have foam already attached, you may not need separate underlayment; check the product. Otherwise roll it out one strip at a time starting at the longest wall, keep it flat with no crimps, and follow the maker’s seam instructions.

Concrete needs more care, because a slab can carry moisture up from the ground. This Old House recommends a 6-mil polyethylene vapor barrier under the underlayment for basement installs, and the same caution makes sense on a slab.

It also gives a simple test first: tape a sheet of plastic to the slab and leave it. If moisture beads on the underside, the slab is too wet to cover. Some underlayments have a barrier built in; your product’s instructions say what it needs over concrete.

Roofshire Construction crew staging stacked lumber on a lakefront lot to frame a new dock
Materials staged on site before a Roofshire framing job. Flooring gets the same treatment indoors: in the room, out of the packaging, before it goes down.

Step 3: Undercut the Doors and Lay the First Row

Set a scrap of underlayment and a plank on the floor beside each door casing and use the stack as a guide to cut the bottom of the casing with a jamb saw or handsaw. The new floor then slides underneath instead of being scribed around the trim.

Start along the longest wall, with the tongue side facing the wall. Put spacers along the wall to hold an expansion gap of about ¼ inch; Bob Vila suggests one about every 12 inches. Join planks end to end by angling one into the next and pressing down until it clicks. Cut the last piece in the row to length, leaving the same gap at the end wall.

That gap is not optional. Laminate moves with temperature and humidity, and a floor pinned tight against a wall has nowhere to go, so it buckles. The baseboard or quarter-round covers the gap later.

Step 4: The Rest of the Rows

  1. Start each new row with the offcut from the row before when it is long enough, so the end joints fall in different places.
  2. Keep end joints at least 6 inches apart from row to row (Bob Vila), and avoid a regular stair-step pattern.
  3. Angle each plank’s tongue into the groove of the row before, lower it flat, and tap it home with a tapping block and dead blow hammer. Never hit the plank edge directly.
  4. Check every few rows that the seams are tight and the gap at the walls is still there.

You can walk on the floor as you go. Because nothing is glued, there is no curing time.

Step 5: Last Row and Trim

Measure the space left at the far wall, subtract the expansion gap, and rip the last row to width. Tap it into place with a pull bar. Then pull the spacers, put the baseboards or quarter-round back, and add transition strips at doorways and wherever the laminate meets another floor. Fasten trim to the wall, not through the floor, so the floor can still move.

Roofshire Construction roofer installing new architectural shingles beside the ridge vents on a home surrounded by oak trees
A Roofshire roofer working near the ridge. When a floor is ruined by water from above, the roof gets fixed first.

Laminate and Water

Laminate’s top layer resists water and a melamine layer underneath adds moisture resistance, but the core is wood fiber. This Old House notes that some makers allow it in bathrooms, with the edges carefully sealed. Standing water that gets into the seams is what ruins it: planks swell and lift at the joints, and a swollen plank cannot be sanded back down.

One source of that water people miss is the roof. If the planks are swelling near an outside wall or under a ceiling stain, find the leak before you replace a single board.

We start with a free roof inspection, fix the source, and if the house got soaked, it has to be dried out by a water-mitigation company first. Then we take out the damaged flooring, check the subfloor and put the room back together. If the ceiling took water too, the drywall can be part of the same job.

Doing it yourself saves the labor, which is a big share of the price: our guide to flooring installation cost has the numbers. If you would rather hand it off, we work across greater Houston, from Houston out to Spring, The Woodlands, Conroe, Pearland, Missouri City and Fresno. Hablamos español. Get a free flooring estimate or use the form on this page.

Sources checked November 6, 2026: This Old House, How to Lay a Floating Floor (updated June 2, 2026); This Old House, Laminate Flooring Guide (updated June 8, 2026); Bob Vila, How to Install Laminate Flooring (updated February 24, 2022); EPA, Learn About Asbestos (updated July 13, 2026). Always follow your product’s installation instructions.

Laminate Installation Questions

How do you install laminate flooring?

Let the planks acclimate in the room for at least 48 hours, prepare a flat, clean, dry subfloor, lay underlayment (with a moisture barrier over damp concrete), then click the planks together row by row with about a quarter-inch expansion gap at every wall and end joints staggered at least 6 inches. Finish with baseboards and transition strips.

Do you need a moisture barrier under laminate on concrete?

Often, yes. This Old House recommends a 6-mil polyethylene vapor barrier under the underlayment for basement installs, and suggests taping plastic to the slab first: if moisture beads under it, the slab is too wet to cover. Some underlayments have a barrier built in, so check the product's instructions.

How long should laminate acclimate before installation?

At least 48 hours in the room where it will be installed, out of its plastic, according to This Old House, which also suggests keeping the room at 60 to 80 degrees and 30 to 50 percent relative humidity.

How big should the expansion gap be for laminate?

About a quarter inch around the whole room, held with spacers while you work. The baseboard or quarter-round covers it. Without the gap, the floor has no room to move and can buckle.

Can you put laminate flooring in a bathroom?

Some manufacturers allow it, with the edges carefully sealed, according to This Old House. The core is wood fiber, so water that gets into the seams makes planks swell. Check the product's warranty before using it in a wet room.

What should I do if my laminate is swelling near a wall or under a ceiling stain?

Find the water first. Swelling near an outside wall or under a stain often points to a leak, and new planks over a wet subfloor will swell again. Roofshire's roof inspections are free, and we replace the damaged flooring once the source is fixed.

Get a Free Inspection